amusedslidernews1

Foto di A. Smedile INGV, RM

19 February 2021
On February 19, 2021, a survey was carried out in the area of the Castiglione paleolake in order to
identify the most suitable location for the two 120 m long parallel drillings. The boreholes will
involve continuous core drilling with undisturbed recovery of the cores inside PVC punches.