2.1 |
Requirement Baseline Document (RBD) V1 |
2 |
INGV |
3 |
CSIC, BIRA |
|
|
3.1 |
Design and Technical Specifications Document (DTSD) V1 |
3 |
INGV |
3 |
TeraDue, CSIC,BIRA |
|
|
4.1 |
Plan of the Integration and Implementation Report (IIR) |
4 |
TerraDue |
3 |
INGV, CSIC,BIRA |
|
|
5.1 |
Plan of the Validation Report (VR) |
5 |
BIRA |
3 |
INGV, CSIC |
|
|
2.2 |
Draft Requirement Baseline Document, version V2 |
2 |
INGV |
6 |
CSIC, BIRA |
|
|
3.2 |
Draft Design and Technical Specifications Document (DTSD) V2 |
3 |
INGV |
6 |
TeraDue, CSIC,BIRA |
|
|
4.2 |
Draft of the DTC Integration and Implementation Report, V1 |
4 |
TerraDue |
6 |
INGV, CSIC,BIRA |
|
|
5.2 |
Draft of the Validation Report V1 |
5 |
BIRA |
6 |
INGV, CSIC |
|
|
6.1 |
Draft of the Impact Assessment Report (IAR), version V1 |
6 |
CSIC |
6 |
INGV, TerraDue, BIRA |
|
|
7.1 |
Draft of the Scientific and Technical Roadmap (STR) |
7 |
INGV |
6 |
TerraDue, CSIC, BIRA |
|
|
1.1 |
Minutes of meetings - MOM (1 per month) |
1 |
INGV |
12 |
TerraDue, CSIC, BIRA |
|
|
1.2 |
Progress reports - PR (every 2 months) |
1 |
INGV |
12 |
TerraDue, CSIC, BIRA |
|
|
1.3 |
Mid-term review report - MTR |
1 |
INGV |
12 |
TerraDue, CSIC, BIRA |
|
|
2.3 |
Requirement Baseline Document V2 |
2 |
INGV |
12 |
CSIC, BIRA |
|
|
3.3 |
Final Design and Technical Specifications Document (DTSD) V2 |
3 |
INGV |
12 |
TeraDue, CSIC,BIRA |
|
|
4.3 |
DTC Integration and Implementation Report, V1 |
4 |
TerraDue |
12 |
INGV, CSIC,BIRA |
|
|
5.3 |
Validation Report V1 |
5 |
BIRA |
12 |
INGV, CSIC |
|
|
6.2 |
Prototype of the DTC demonstration, version V1 |
6 |
CSIC |
12 |
INGV, TerraDue, BIRA |
|
|
6.3 |
Report of the Demonstration of the DTC, version V1 |
6 |
CSIC |
12 |
INGV, TerraDue, BIRA |
|
|
6.4 |
Impact Assessment Report V1 |
6 |
CSIC |
12 |
INGV, TerraDue, BIRA |
|
|
7.2 |
Scientific and Technical Roadmap (STR) Version 1 |
7 |
INGV |
12 |
TerraDue, CSIC, BIRA |