LIST

D

Deliverable Name 

WP

Lead

Month

Participants

Link

2.1

Requirement Baseline Document (RBD) V1           

2

INGV

3

CSIC, BIRA

 

3.1

Design and Technical Specifications Document (DTSD) V1

3

INGV

3

TeraDue, CSIC,BIRA

 

4.1

Plan of the Integration and Implementation Report (IIR)

4

TerraDue

3

INGV, CSIC,BIRA

 

5.1

Plan of the Validation Report (VR)

5

BIRA

3

INGV, CSIC

 

2.2

Draft Requirement Baseline Document, version V2

2

INGV

6

CSIC, BIRA

 

3.2

Draft Design and Technical Specifications Document (DTSD) V2

3

INGV

6

TeraDue, CSIC,BIRA

 

4.2

Draft of the DTC Integration and Implementation Report, V1

4

TerraDue

6

INGV, CSIC,BIRA

 

5.2

Draft of the Validation Report V1

5

BIRA

6

INGV, CSIC

 

6.1

Draft of the Impact Assessment Report (IAR), version V1

6

CSIC

6

INGV, TerraDue, BIRA

 

7.1

Draft of the Scientific and Technical Roadmap (STR)

7

INGV

6

TerraDue, CSIC, BIRA

 

1.1

Minutes of meetings - MOM (1 per month)

1

INGV

12

TerraDue, CSIC, BIRA

 

1.2

Progress reports - PR (every 2 months)

1

INGV

12

TerraDue, CSIC, BIRA

 

1.3

Mid-term review report - MTR

1

INGV

12

TerraDue, CSIC, BIRA

 

2.3

Requirement Baseline Document V2

2

INGV

12

CSIC, BIRA

 

3.3

Final Design and Technical Specifications Document (DTSD) V2

3

INGV

12

TeraDue, CSIC,BIRA

 

4.3

DTC Integration and Implementation Report, V1

4

TerraDue

12

INGV, CSIC,BIRA

 

5.3

Validation Report V1

5

BIRA

12

INGV, CSIC

 

6.2

Prototype of the DTC demonstration, version V1

6

CSIC

12

INGV, TerraDue, BIRA

 

6.3

Report of the Demonstration of the DTC, version V1

6

CSIC

12

INGV, TerraDue, BIRA

 

6.4

Impact Assessment Report V1

6

CSIC

12

INGV, TerraDue, BIRA

 

7.2

Scientific and Technical Roadmap (STR) Version 1

7

INGV

12

TerraDue, CSIC, BIRA